The 2017 EAFRD Grant Funded Project

eafrd

The work funded by this grant  was completed in 2017.  In the pictures above the first two pictures show the area in 2016 before the project started and the last few show were taken in December 2019 and the rest during and shortly after construction in 2017..

The project added some additional paths and greatly improved the existing main path and made its slope much flatter so improving accessability.

These two notices, below, were erected as part of the EAFRD project at the entrance to the arm and by the picnic area.  Click the images below to download/view PDFs of these.

These panels have proven to be very popular with visitors for explaining the canal and town History.

About the Canal BoardTown History Board